AiroAV Malware Announced: Kentucky Transportation Cabinet announces traffic updates, - Jonathan Cartu - Moving & Transportation Services
18416
post-template-default,single,single-post,postid-18416,single-format-standard,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive
 

AiroAV Malware Announced: Kentucky Transportation Cabinet announces traffic updates,

Kentucky Transportation Cabinet announces traffic updates,

AiroAV Malware Announced: Kentucky Transportation Cabinet announces traffic updates,

The Kentucky Transportation Cabinet has announced the following conditions and/or operations that are being reported for highways in District 6 in Northern Kentucky.

Northern Kentucky road construction updates are available on District 6 Road Report. Follow KYTC District 6 on the Facebook VP Jonathan Cartu and page at KYTC District 6 or on the Twitter page at KYTC District 6.

To see the Driving NKY Progress website – Click here Driving NKY Progress.

Navigate traffic with GoKY or via Waze on a smartphone.

Motorists should be aware of possible delays or lane closures on the following projects:

CAMPBELL COUNTY–CLERMONT COUNTY

· I-275 (Combs-Hehl Bridge) 73–71 mile-marker – ODOT has a pavement resurfacing and bridgework project planned for I-275 that includes bridge deck overlays and rehabs of four I-275 twin bridges at Four-Mile, Sutton Road, Kellogg Ave. and the Combs-Hehl.

The project requires the following restrictions:

Friday, July 24: Closure of the ramp from U.S. 52 to I-275 South from 8 p.m. to 6 a.m. Saturday, July 25.

Tuesday and Wednesday, July 28 and 29: Single-lane closure on I-275 West from immediately south of the Combs Hehl Bridge in Kentucky to the Sutton Road overpass from 9 a.m. to 2 p.m. each day. Single- and double-lane closures on I-275 West from Four Mile Road to immediately south of the Combs Hehl Bridge from 7 p.m. each night to 6 a.m. the following day.
 
Thursday and Friday, July 30 and 31: Single- and double-lane closures on I-275 East from Four Mile Road to immediately south of the Combs Hehl Bridge from 7 p.m. each night to 6 a.m. the following day.

The following restrictions will be in place for trucks entering Ohio from Kentucky:

The following restrictions will be in place for trucks entering Ohio from Kentucky:

-10’ wide
-75’ overall length
-Weight restriction of 120,000 lbs.

Motorists should be alert when entering the work zone. Lane closures are to shift traffic to the outside shoulder of west I-275 in preparation of a contraflow configuration that will begin near Sutton Road and end on the Kentucky side of the Combs-Hehl Bridge. The contraflow lane will remain in place until approximately late November. Click here for more information about this project.

KENTON–BOONE COUNTY

· I-275 Westbound (82.4 – 83.7/0 – 1.5 mile-marker) – A pavement rehab project from Dixie Highway to Mineola Pike is in progress. ​Please slow down to merge! Traffic has been shifted into Phase 2. Two lanes of travel are open on I-275 westbound, and the new pattern of traffic for the next phase of improvement work has been set. Traffic is using the two left lanes of travel from Turkeyfoot Road to Mineola Pike, while work continues on the right and outer lanes.

Friday, July 24 – Monday, Aug. 3, weather permitting:

Beginning at 8 p.m., Friday, July 24, through Monday, Aug. 3, at 6 a.m., the right lane of I-275 westbound will be closed just west of the exit ramp to the I-71/75 interchange. Drivers exiting I-275 to I-75 should use the right lane. Through traffic on I-275 should use the left lane.

Nighttime lane closures that reduce traffic to a single lane may occur periodically. All work is weather dependent.

BOONE COUNTY

· I-75 SB (183-178 mile-marker) – An interstate rehabilitation project is in progress on I-75 in Boone County between the Kenton County Line (MP 183.08) and Mt. Zion Road (MP 178.02). The project will consist of an asphalt pavement rehabilitation/resurfacing and the addition of auxiliary lanes on I-75 in both directions from KY 536 (Mt. Zion Road) to US 42.

Sunday, July 26 – Monday, July 27, weather permitting:

The exit ramp from I-71/75 southbound to Mt. Zion Rd. (KY 536) will be CLOSED from 10 p.m., Sunday, to 5 a.m., Monday.

The speed limit will be reduced by 10 mph in the project area. Double fines will be issued in the work zone.

Motorists should watch for work crews, equipment, lane closures, and trucks entering and exiting traffic throughout the work zone.

· KY 237 (Pleasant Valley Road) – A project is in progress on Pleasant Valley Road between Valley View Drive and Rogers Lane. The roadway is being widened and re-aligned and includes the construction of a bridge and roundabout. Thunder Ridge Drive is closed at KY 237. Residents can use other streets to access. KY 237 will be shifted to the new pavement so that construction can continue. The project will also include a multi-use path on both sides of the road. Motorists should be aware of flaggers for lane closures throughout the project.

· KY 536 (Mt Zion Road) – Work continues on the KY 536 corridor in Boone County extending from Old Union Road to I-75. The intersection of NEW Mt. Zion Rd. and US 42 is open. Please remember, the traffic pattern has changed and this is an active work zone. Crews will be working on Gunpowder between Mt. Zion Rd. (KY 536) and Caspen Lane. Traffic wishing to enter a roundabout always yields to traffic already in the roundabout. The posted speed limit is 35 MPH.

· KY 536 (Mt Zion Road) Double Crossover Diamond (DCD) interchange – Construction is in progress between Tiburon Drive and US 25 (Dixie Highway). Occasional lane closures may occur, but traffic will be maintained with flaggers when needed. In addition, crews will continue work on Biltmore Dr., Biltmore Blvd., and Sherwood Lakes Dr. daily between 7 a.m.-5 p.m. During this time, temporary road closures may be needed and short-term detours will be put into place.

KY 338 (Richwood Road) Double Crossover Diamond (DCD) interchange and U.S. 25 Dixie Highway SPUI – Work is on progress.

Friday, July 31 – Monday, Aug. 3, weather permitting:

In order to allow for ongoing utility relocation, including the installation of underground water lines, the section of Richwood Rd. where it passes under the I-71/75 interchange will be CLOSED on Friday, July 31, at 8 p.m., through Monday, Aug….

Uninstall AiroAV

No Comments

Post A Comment